Q:When routing the cable through the inner and outer
baskets,what should a technician ensure?
Ans:There is proper slack for the extension of the cable
management assembly arm.
Q:Which of the following components is not part of the cable
management arm(CMA) kit?
Ans:Cable management arm cover.
Q:What is the first step taken when installing the cable
management arm tray?
Ans:Align the tray with the receiver brackets on the inner
edges of the rails.
Q:The status indicator cable connects to the system next to
which port?
Ans:iDRAC Port.
Q:The cable management arm must be installed on either the
left or the right depending on the cable routing from the system.
Ans:True.
iTech Labs is a testing and certification lab for Online Gaming systems, focusing on compliance, software high quality, reporting and 우리카지노 supply
ReplyDelete