Showing posts with label answer. Show all posts
Showing posts with label answer. Show all posts

Wednesday, January 27, 2016

Onsite Troubleshooting Q & A

Q: You should troubleshoot before opening all parts.
Ans:True
Q2:You should troubleshoot whenthe dispatch says”replace all parts”.
Ans:False.
Q3:You should troubleshoot after parts replacement to verify the system is operational.
Ans:True.
Q4:You should troubleshoot when the part replaced did not solve the customer’s problem.
Ans:True.
Q5:Many isses can be addressd by:
Ans:Downloading and installing the latest version of BIOS.
Q6:A part is considered “used”or”consumed”if-
Ans:There are pen or ink marks on the part or the part’s label.
If the antistatic seal is broken.
If you appl any label that says”defective”,”consumed”,”used”.

12th Generation Server Q & A

Q:When routing the cable through the inner and outer baskets,what should a technician ensure?
Ans:There is proper slack for the extension of the cable management assembly arm.
Q:Which of the following components is not part of the cable management arm(CMA) kit?
Ans:Cable management arm cover.
Q:What is the first step taken when installing the cable management arm tray?
Ans:Align the tray with the receiver brackets on the inner edges of the rails.
Q:The status indicator cable connects to the system next to which port?
Ans:iDRAC Port.
Q:The cable management arm must be installed on either the left or the right depending on the cable routing from the system.

Ans:True.